Custom order management software (OMS)
Short answer: ANTLR Tech builds order management software for companies that have outgrown spreadsheets and disconnected apps — orders, allocations and fulfilment status in one place — for wholesale, jewelry wholesale and multi-channel ops that outgrew inboxes. A first release typically ships in 6–14 weeks.
- Serving
- Worldwide
- First release
- 6–14 weeks
- Pricing
- Fixed, after planning
- Ownership
- Yours, in full
Order management software, answered directly
What is order management software?
Order management software from ANTLR Tech is orders, allocations and fulfilment status in one place — for wholesale, jewelry wholesale and multi-channel ops that outgrew inboxes. It is built for your operation rather than configured from a product, so the screens follow the way your team already works. Distributors, jewelry wholesalers and brands selling B2B and retail.
How much does order management software cost?
It depends on scope, integrations and how many locations you run — so we don't publish a number that would be wrong for most people. What we do commit to is the shape: a short paid discovery, then a fixed price for a defined first release that you approve before any production code is written. No open-ended billing, and no surprise at the end.
How long does it take to build?
A first working release lands in 6–14 weeks from kickoff. We run two-week cycles with a demo at the end of each, so your team is using part of the system while the rest is still being built — rather than waiting for a single reveal at the end.
Who is order management software for?
Wholesale and multi-channel sellers drowning in order email. Distributors, jewelry wholesalers and brands selling B2B and retail. If an off-the-shelf product already fits without workarounds, we will say so — custom software only pays when the process is specific enough that rented tools fight you.
What’s included
What’s included in an order management software build
OMS for how you actually sell and ship — not a marketplace template.
- 01
Order capture
Portal, EDI-ish import, or sales entry.
- 02
Price lists
Account and tier pricing that sticks.
- 03
Stock checks
Promise only what you can ship.
- 04
Allocation rules
Priority customers and holds.
- 05
Pick / pack
Warehouse steps on the same order.
- 06
Shipping updates
Tracking back on the record.
- 07
Buyer portal
Reorder and status without calling.
- 08
Invoice handoff
Billing from what actually shipped.
Operators already running on it
−62%
Dispatch moved off the whiteboard. Four depots now plan from the same board, and invoicing takes hours instead of days.
Halden Logistics
11 days
Quote to production start, down from twenty-six. Estimators and the floor read the same job record.
Cedarline Mfg.
15 hrs/wk
Returned to the office team. Job sheets, parts and signatures arrive as the crew finishes, not three days later.
Northbay Supply
How an order management software project runs
01 · 1–2 weeks
Discover
We map how work moves today, exceptions included, before anything is built.
02 · 1 week
Plan
A phased build, a fixed first release and a cost you can approve.
03 · 4–12 weeks
Build
Two-week cycles with your team testing as we go — live beside the old process first.
04 · Ongoing
Improve
New rules, branches and reporting as the operation grows.
Questions buyers ask about order management software
Is this a generic order management product?
No. Order management from ANTLR Tech is built around how your team already works, then replaces the spreadsheets and disconnected apps holding that process together. You are not configuring someone else's product to fit — the screens follow your steps, your terminology and your exceptions.
Can order management integrate with what we already use?
Yes. Accounting, payments, email and the systems you intend to keep stay connected rather than being replaced for the sake of it. Anything with an API is in scope, and we agree the integration list during planning so nothing surfaces as a surprise mid-build.
Who owns the software?
You do. The repository, the hosting accounts and the data are yours from day one, documented at handover so another team could pick it up. There is no seat licence, and no fee that exists only to keep you with us.
How small can a first order management release be?
One workflow your team runs daily. We deliberately scope the first release to the narrowest slice that removes real manual work, because a narrow release in production teaches us more than a wide one still sitting in staging. The rest follows once it is earning its keep.
Do we need a written specification before starting order management software?
No. Most clients arrive with a problem rather than a spec. Deciding what to build first — and what to leave alone — is the work of the discovery stage, and you keep the process map that comes out of it either way.
Can it replace the system we run today?
Usually, yes. We migrate historical records, run both systems in parallel for one cycle, and cut over only once your team confirms the new one is faster for daily work. Nothing is switched off before that point.
Other systems we build
Systems that work alongside order management software
Same system, by industry
Order management software by industry
Each opens the order management software build for that industry, by region.
Talk to an engineer
Forward us a typical order email.
We'll show the OMS shape it wants. A 45-minute working session — you leave with a process map and a recommendation, whether or not you hire us.