Custom Android and iPhone apps for business operations
Short answer: ANTLR Tech builds custom mobile apps for companies that have outgrown spreadsheets and disconnected apps — iPhone and Android apps your people open on site — jobs, orders, inventory and approvals — talking to your real backend, not a mobile afterthought. A first release typically ships in 6–14 weeks.
- Serving
- Worldwide
- First release
- 6–14 weeks
- Pricing
- Fixed, after planning
- Ownership
- Yours, in full
Custom mobile apps, answered directly
What is custom mobile apps?
Custom mobile apps from ANTLR Tech is iPhone and Android apps your people open on site — jobs, orders, inventory and approvals — talking to your real backend, not a mobile afterthought. It is built for your operation rather than configured from a product, so the screens follow the way your team already works. Technicians, drivers, floor staff, sales on the road, buyers on site.
How much does custom mobile apps cost?
It depends on scope, integrations and how many locations you run — so we don't publish a number that would be wrong for most people. What we do commit to is the shape: a short paid discovery, then a fixed price for a defined first release that you approve before any production code is written. No open-ended billing, and no surprise at the end.
How long does it take to build?
A first working release lands in 6–14 weeks from kickoff. We run two-week cycles with a demo at the end of each, so your team is using part of the system while the rest is still being built — rather than waiting for a single reveal at the end.
Who is custom mobile apps for?
Teams whose work happens away from a desk. Technicians, drivers, floor staff, sales on the road, buyers on site. If an off-the-shelf product already fits without workarounds, we will say so — custom software only pays when the process is specific enough that rented tools fight you.
What’s included
What’s included in a custom mobile apps build
iOS and Android apps wired to the system you own.
- 01
iPhone app
App Store build your staff will install.
- 02
Android app
Play Store build for the phones you issue.
- 03
Auth & roles
Crew vs manager vs client access.
- 04
Job / order flows
The screens used ten times a day.
- 05
Camera & files
Photos and docs on the record.
- 06
Push notifications
Assigned, changed, overdue.
- 07
Offline capture
Queue actions when coverage drops.
- 08
Backend API
Talks to your CRM, ERP or ops system.
Operators already running on it
−62%
Dispatch moved off the whiteboard. Four depots now plan from the same board, and invoicing takes hours instead of days.
Halden Logistics
11 days
Quote to production start, down from twenty-six. Estimators and the floor read the same job record.
Cedarline Mfg.
15 hrs/wk
Returned to the office team. Job sheets, parts and signatures arrive as the crew finishes, not three days later.
Northbay Supply
How a custom mobile apps project runs
01 · 1–2 weeks
Discover
We map how work moves today, exceptions included, before anything is built.
02 · 1 week
Plan
A phased build, a fixed first release and a cost you can approve.
03 · 4–12 weeks
Build
Two-week cycles with your team testing as we go — live beside the old process first.
04 · Ongoing
Improve
New rules, branches and reporting as the operation grows.
Questions buyers ask about custom mobile apps
Is this a generic mobile apps product?
No. Mobile apps from ANTLR Tech is built around how your team already works, then replaces the spreadsheets and disconnected apps holding that process together. You are not configuring someone else's product to fit — the screens follow your steps, your terminology and your exceptions.
Can mobile apps integrate with what we already use?
Yes. Accounting, payments, email and the systems you intend to keep stay connected rather than being replaced for the sake of it. Anything with an API is in scope, and we agree the integration list during planning so nothing surfaces as a surprise mid-build.
Who owns the software?
You do. The repository, the hosting accounts and the data are yours from day one, documented at handover so another team could pick it up. There is no seat licence, and no fee that exists only to keep you with us.
How small can a first mobile apps release be?
One workflow your team runs daily. We deliberately scope the first release to the narrowest slice that removes real manual work, because a narrow release in production teaches us more than a wide one still sitting in staging. The rest follows once it is earning its keep.
Do we need a written specification before starting custom mobile apps?
No. Most clients arrive with a problem rather than a spec. Deciding what to build first — and what to leave alone — is the work of the discovery stage, and you keep the process map that comes out of it either way.
Can it replace the system we run today?
Usually, yes. We migrate historical records, run both systems in parallel for one cycle, and cut over only once your team confirms the new one is faster for daily work. Nothing is switched off before that point.
Other systems we build
Systems that work alongside custom mobile apps
Same system, by industry
Custom mobile apps by industry
Each opens the custom mobile apps build for that industry, by region.
Talk to an engineer
Tell us who lives on their phone at work.
We'll sketch the Android and iPhone flows first. A 45-minute working session — you leave with a process map and a recommendation, whether or not you hire us.